Necessity of roving frame
1.
The first reason is related to the required draft. Sliver is a thick, untwisted
strand that tends to be hairy and to create fly. The draft needed to convert
this to a yarn is in the region of 300-500. The drafting arrangements of ring
spinning machines, in their current forms, are not capable of processing this
strand in a single drafting operation to create a yarn of short-staple fibers
that meets all the normal demands on such yarns. The fine , twisted roving is
significantly better suited to this purpose.
View
of roving frame
1.Attenuation
of drawn sliver to form roving of required count by drafting.
2.Insert
small amount of twist to give required strength of roving.
3.Wind
the twisted roving on to the bobbin.
4.Build
the roving in bobbin such a form which will facilitate handling, withdrawing
& transfer to the next process.
Operations involved in simplex machine
1.Creeling
2.Drafting
3.Twisting
4.Winding
5.Building
6.Doffing
Creeling
Creel draft
Creel Stop motion
Block creelingDrafting
To reduce the wt/unit length of sliver to make it suitable for ring spinning system
Twisting
To insert small amount of twist to give required strength of roving.
Winding
To wind the twisted roving on to bobbin.
Building
To build the roving in bobbin such a form which will facilitate handling, withdrawing & transfer to the next process.
Doffing
To replace an empty bobbin at the place of full roving bobbin.
Manufacturer
of speed frame
1. Rieter (Switzerland)
Used in recent spinning mill
2. Toyoda (Japan)(FL-16, FL- 100)
Used most in our country
3. LMW(India)/Laskmi
0 Comments