Allowance for SMV calculation

Allowance for SMV calculation

 

  • Allowance is basically some additional time for needs ( drink water, Cleaning fatigue and delays).
  • Allowance can be given as a percent of work time .
  • Allowance are the interruptions that occur during the working day.
  1. Personal allowance-5%
  2. Fatigue allowance-5%
  3. Delay/Machine allowance-5%
  4. Contingency allowance-5%
  • Personal Allowance: drink water, going to wash room and Clean up after operations.
  • Fatigue Allowance: Standing with a load, walking with a load, lifting a load, anxiety, monotony, temperature, sound, illumination
    (একটি বোঝা নিয়ে দাঁড়িয়ে থাকা, একটি বোঝা নিয়ে হাঁটা, একটি বোঝা উত্তোলন, 
    উদ্বেগ, একঘেয়েমি, তাপমাত্রা, শব্দ, আলোকসজ্জা)
  • Delay Allowance: Machinery is kept in repair, tool breakage, minor adjustment.

  • Contingency Allowance:Power Failure,Input gap